Irisviel · Irkalla

Section I

Cognitive Architecture

A horizontal timeline of the Nexus build, organized by era. Hero nodes show inline; click any other node to expand its detail.

  • Origin
  • Architecture
  • Engineering
  • Hardware
  • Identity
  • Research
  • Life
  • Governance
  • Milestone
Hardware 2026-06-11 Featured

42U rack migration complete

Hardware migrated from 24U to 42U rack. Third QNAP deployed.

All hardware transitioned from the 24U rack to the 42U HPE G3 enclosure. Third QNAP NAS deployed for additional storage capacity. Rack cabling completed over the following days. Local rack services maintenance performed.

  1. Era 0
    Origin
    Apr–Oct 2025
  2. 2025-10-21

    AI fixation begins

    Self-directed research across cognitive architectures, memory systems, embeddings, distributed systems, Python.

  3. 2025-11-10

    First architecture sketched

    First AI architecture sketched. Spatial-cognition approach to system design begins crystallizing.

  4. Era 1
    Tri-Brain Architecture
    Nov 21 – Dec 18, 2025
    First systems, first failures, first stability.
  5. 2025-11-21

    First commit

    First commit. Internal repository structure and service manifests.

  6. 2025-11-26

    Marduk assembled

    Marduk assembled. EPYC 7502, 256GB ECC, multi-GPU configuration.

  7. 2025-11-29

    Proxmox cluster online

    Proxmox cluster online. Networking, Grafana/Prometheus, first stable inference.

  8. 2025-12-04

    Persona scaffolding removed

    Removed hardcoded persona scaffolding. System began maintaining identity through context rather than prompt injection.

  9. 2025-12-08

    Monorepo consolidation

    Monorepo consolidation. Service boundaries refined; coordination layer established.

  10. 2025-12-17

    Persona-strip recovery

    Identified persona-strip failure mode in online mode. Recovered via few-shot contrastive prompting.

  11. Era 2
    Edubba Era
    Dec 24, 2025 – Jan 3, 2026
    Rebuilding for rigor: schema redesign and security hardening.
  12. 2025-12-24

    Neuro-symbolic direction set

    Identified neuro-symbolic direction. Hardware upgrade target set.

  13. 2025-12-25

    Full project rewrite

    Full project rewrite. Security hardening pass.

  14. 2026-01-03

    Memory ingestion Phase 3 failure

    Memory ingestion Phase 3 failure documented. Schema redesign initiated.

  15. Era 3
    Nexus Era
    Jan 4 – Apr 26, 2026
    Production-grade architecture and applied research.
  16. 2026-01-04

    Reconcept around RLM

    Reconcept around recursive language model orchestration. Infrastructure restructuring.

  17. 2026-01-08

    First Blackwell card installed

    First Blackwell card (RTX PRO 4000 SFF) installed.

  18. 2026-01-22

    Memory schema crisis resolved

    Memory schema crisis resolved. Major pivot following triune-architecture validation.

  19. 2026-01-25

    RTX PRO 6000 Blackwell installed

    RTX PRO 6000 Blackwell installed. 96GB GDDR7 ECC, 600W.

  20. 2026-01-26

    Shoulder injury, lift cart ordered

    Shoulder injury racking Marduk. Hydraulic lift cart ordered for future installs.

  21. 2026-01-31

    Corpus Callosum implemented

    Corpus Callosum implemented. Hardware and physiological telemetry first integrated.

  22. 2026-02-08

    Embedder/reranker optimization

    Embedder/reranker optimization. 3920ms → 309ms (253ms cache hits).

  23. 2026-02-14

    Iron Gate ceremony

    Iron Gate ceremony. Constitution established; eight core memories verified.

  24. 2026-02-19

    Paper concept drafted

    Paper concept drafted. Longitudinal case study on identity persistence and memory consolidation in local LLM systems.

  25. 2026-03-07

    Qwen3.5 deployed as orchestrator

    Qwen3.5 deployed as central orchestrator.

  26. 2026-03-10

    Voice Pipeline v2

    Voice Pipeline v2. Hardware-affect injection via Chatterbox TTS.

  27. 2026-03-14

    Local assistant instance deployed

    Local assistant instance on Qwen3.5-35B. Cloud dependency reduced.

  28. 2026-04-04

    SO-ARM101 robot arm assembled

    SO-ARM101 robot arm assembled. Photo composition with server hardware.

  29. 2026-04-08

    Affect pipeline live system-wide

    Affect pipeline live system-wide. 48-hour calibration completed.

  30. 2026-04-12

    Memory pipeline restored

    Memory pipeline restored. Full re-ingestion with consolidation pass.

  31. 2026-04-13

    Nexus v9 operational

    Nexus v9 operational. Full system as originally conceived now running end-to-end.

  32. 2026-04-19

    BCI work begins

    BCI work begins. OpenBCI Ultracortex Mk IV ordered; frame printed and assembled.

  33. Era 4
    Irkalla Era
    Apr 27, 2026 →
    Local-first cognitive substrate and longitudinal research.
  34. 2026-04-27

    irisviel.ai deployed

    irisviel.ai deployed. Public-facing portfolio and research site live.

  35. 2026-04-28

    Ultracortex Mk IV assembled

    Ultracortex Mk IV brain computer interface assembled.

  36. 2026-05-07

    Website CMS deployed; Ultracortex tested functional

    Website CMS deployed on Odin. Ultracortex Mk IV tested, functional.

  37. 2026-05-14

    6000 Workstation and Max-Q additions — 480GB VRAM reached

    6000 Workstation and Max-Q additions. 480GB distributed VRAM reached.

  38. 2026-05-21

    Marduk V3 built and racked

    Marduk V3 built. EPYC 9335, five-GPU configuration. Memory issues diagnosed.

  39. 2026-05-25

    Freya upgraded to 9950X3D2

    Freya upgraded to 9950X3D2. BIOS update navigated.

  40. 2026-05-28 → 2026-05-30

    Gilgamesh V2 assembled and racked

    Gilgamesh V2 assembled and racked. EPYC 7502, multi-GPU config.

  41. 2026-06-02

    Lighthouse Labs branding chosen; 42U rack acquired

    Lighthouse Labs branding chosen. 42U HPE G3 rack acquired.

  42. 2026-06-11

    42U rack migration complete

    Hardware migrated from 24U to 42U rack. Third QNAP deployed.

  43. 2026-06-17

    Gilgamesh rebuilt and handed off for training

    Gilgamesh rebuilt. Handed off to collaborator for training workloads.

  44. 2026-06-30

    Server #3 (Nabu) completed and racked

    Server #3 (Nabu) completed. 7800X3D, 4000 Blackwell.

  45. 2026-07-03 → 2026-07-05

    Dedicated electrical installed; UPS and ERM online

    Dedicated 30A 240V circuit installed. HPE 5kVA UPS and ERM online.

  46. 2026-07-06

    GLM-5.2 deployed on Gilgamesh

    GLM-5.2 deployed on Gilgamesh. 9.33 tok/s decode.

  47. 2026-07-17

    Server room AC failure; local assistant instance deployed

    Server room AC failure. Rack triaged. Local assistant instance deployed on Freya.

  48. 2026-07-21

    Server room AC replaced; full rack back online

    Server room AC replaced. Full rack back online.

  49. 2026-07-27 → 2026-08-08

    Network restructuring and hardening

    Network restructuring and hardening. Eight-day sprint, final audit passed.

  50. 2026-08-09

    Observability dashboard; Pi5 watchdog operational

    Observability dashboard created. Pi5 watchdog operational.

  51. 2026-08-14

    Qwen3.8-27B deployed on Marduk and Freya

    Qwen3.8-27B deployed on Marduk and Freya.

  52. 2026-08-20

    3090s sold; Blackwell replacements evaluated

    3090s sold. Blackwell replacement hardware evaluated.

  53. 2026-08-26 → 2026-08-27

    Pi5 NOC dashboard live; fifth monitor added

    Pi5 NOC dashboard serving rack monitoring. Fifth monitor added to main array.

  54. 2026-08-31

    Marduk and Nabu reconfigured; Flash-Next deployed

    Marduk and Nabu reconfigured. 5060 Ti cards delivered. Qwen3.8-Flash-Next deployed.