Irisviel · Irkalla

Section I

Cognitive Architecture

A horizontal timeline of the Nexus build, organized by era. Hero nodes show inline; click any other node to expand its detail.

  • Origin
  • Architecture
  • Engineering
  • Hardware
  • Identity
  • Research
  • Life
  • Governance
  • Milestone
OpenBCI Ultracortex Mk IV shown assembled in the workshop.
Hardware 2026-04-28 Featured

Ultracortex Mk IV assembled

Ultracortex Mk IV brain computer interface assembled.

BCI phase continues. Ultracortex Mk IV electronics added to the previously assembled 3d printed polycarbonate frame. Research goal: stable multimodal encoding of system telemetry as a human-readable signal stream. Read-only at first; no stimulation loop.

  1. Era 0
    Origin
    Apr–Oct 2025
  2. 2025-10-21

    AI fixation begins

    Self-directed research across cognitive architectures, memory systems, embeddings, distributed systems, Python.

  3. 2025-11-10

    First architecture sketched

    First AI architecture sketched. Spatial-cognition approach to system design begins crystallizing.

  4. Era 1
    Tri-Brain Architecture
    Nov 21 – Dec 18, 2025
    First systems, first failures, first stability.
  5. 2025-11-21

    First commit

    First commit. Internal repository structure and service manifests.

  6. 2025-11-26

    Marduk assembled

    Marduk assembled. EPYC 7502, 256GB ECC, multi-GPU configuration.

  7. 2025-11-29

    Proxmox cluster online

    Proxmox cluster online. Networking, Grafana/Prometheus, first stable inference.

  8. 2025-12-04

    Persona scaffolding removed

    Removed hardcoded persona scaffolding. System began maintaining identity through context rather than prompt injection.

  9. 2025-12-08

    Monorepo consolidation

    Monorepo consolidation. Service boundaries refined; coordination layer established.

  10. 2025-12-17

    Persona-strip recovery

    Identified persona-strip failure mode in online mode. Recovered via few-shot contrastive prompting.

  11. Era 2
    Edubba Era
    Dec 24, 2025 – Jan 3, 2026
    Rebuilding for rigor: schema redesign and security hardening.
  12. 2025-12-24

    Neuro-symbolic direction set

    Identified neuro-symbolic direction. Hardware upgrade target set.

  13. 2025-12-25

    Full project rewrite

    Full project rewrite. Security hardening pass.

  14. 2026-01-03

    Memory ingestion Phase 3 failure

    Memory ingestion Phase 3 failure documented. Schema redesign initiated.

  15. Era 3
    Nexus Era
    Jan 4 – Apr 26, 2026
    Production-grade architecture and applied research.
  16. 2026-01-04

    Reconcept around RLM

    Reconcept around recursive language model orchestration. Infrastructure restructuring.

  17. 2026-01-08

    First Blackwell card installed

    First Blackwell card (RTX PRO 4000 SFF) installed.

  18. 2026-01-22

    Memory schema crisis resolved

    Memory schema crisis resolved. Major pivot following triune-architecture validation.

  19. 2026-01-25

    RTX PRO 6000 Blackwell installed

    RTX PRO 6000 Blackwell installed. 96GB GDDR7 ECC, 600W.

  20. 2026-01-26

    Shoulder injury, lift cart ordered

    Shoulder injury racking Marduk. Hydraulic lift cart ordered for future installs.

  21. 2026-01-31

    Corpus Callosum implemented

    Corpus Callosum implemented. Hardware and physiological telemetry first integrated.

  22. 2026-02-08

    Embedder/reranker optimization

    Embedder/reranker optimization. 3920ms → 309ms (253ms cache hits).

  23. 2026-02-14

    Iron Gate ceremony

    Iron Gate ceremony. Constitution established; eight core memories verified.

  24. 2026-02-19

    Paper concept drafted

    Paper concept drafted. Longitudinal case study on identity persistence and memory consolidation in local LLM systems.

  25. 2026-03-07

    Qwen3.5 deployed as orchestrator

    Qwen3.5 deployed as central orchestrator.

  26. 2026-03-10

    Voice Pipeline v2

    Voice Pipeline v2. Hardware-affect injection via Chatterbox TTS.

  27. 2026-03-14

    Local Ereshkigal instantiation

    Local Ereshkigal instantiation on Qwen3.5-35B. Cloud dependency reduced.

  28. 2026-04-04

    SO-ARM101 robot arm assembled

    SO-ARM101 robot arm assembled. Photo composition with server hardware.

  29. 2026-04-08

    Affect pipeline live system-wide

    Affect pipeline live system-wide. 48-hour calibration completed.

  30. 2026-04-12

    Memory pipeline restored

    Memory pipeline restored. Full re-ingestion with consolidation pass.

  31. 2026-04-13

    Nexus v9 operational

    Nexus v9 operational. Full system as originally conceived now running end-to-end.

  32. 2026-04-19

    BCI work begins

    BCI work begins. OpenBCI Ultracortex Mk IV ordered; frame printed and assembled.

  33. Era 4
    Irkalla Era
    Apr 27, 2026 →
    Local-first cognitive substrate and longitudinal research.
  34. 2026-04-27

    irisviel.ai deployed

    irisviel.ai deployed. Public-facing portfolio and research site live.

  35. 2026-04-28

    Ultracortex Mk IV assembled

    Ultracortex Mk IV brain computer interface assembled.